-
Port Bronka
Thursday
20/06/2019
Wind 0 m/s
80%
+16.5
Fair
Port Bronka
 Main > News and media > News > At Bronka port the boiler house has been built

At Bronka port the boiler house has been built






A boiler house has been built on the construction site of Multifunctional Sea Cargo Complex (MSCC) Bronka (Big Port Saint-Petersburg).

December 18, 2014 the state commission signed the acceptance certificate of the gas distribution system (external gas supply). Starting from January, 2015 start-up and set-up operations will be carried out in the boiler-house.

Boiler room will provide all the buildings and facilities of MSCC Bronka with heat and hot water.

The installed capacity of the boiler-house equipment is 6.78 MW.

2014-12-22